Requirements for glass fiber cloth wall insulation and facing brick
Source:
aspbf.cn Release date: 2023-02-10
Requirements for glass fiber cloth wall insulation and facing brick:
When the anti-crack mortar reaches the initial setting strength, it should be properly sprayed for curing. After about 7 days, it can be divided and snapped according to the requirements of the drawing.
Requirements for glass fiber cloth wall insulation and facing brick:
When the anti-crack mortar reaches the initial setting strength, it should be properly sprayed for curing. After about 7 days, it can be divided and snapped according to the requirements of the drawing. The face brick joint should not be less than 5 mm. At the same time, the work of sticking the standard point of the surface layer should be carried out to control the size of the surface layer out of the wall and the verticality and flatness of the wall. The base course shall be wetted by water spray, and it is better not to flow.
When tiling, 5-8mm thick face tile bonding mortar shall be plastered on the back of the face tile, and then the face tile shall be pasted on the wall. Gently tap with the handle of the gray spatula to make it attached to the line, and then adjust the vertical joint with a knife. It is forbidden to add water to the mortar during use. Water shall be sprayed for curing 24 hours after construction at normal temperature. The water shall not be too much and shall not flow. The corner bricks are 45